LIST OF PROJECTS THAT WE WERE ASSOCIATED WITH
- Bridge No. 66, 6 x 12.2 m Pre-stressed Concrete Girder bridge on RCC pile foundations for doubling of track between Dhenkanal & Talcher on S.E. Railway.
- Bridge No. 98, as Pre-stressed concrete bridge in connection with Purulia – Kotshila Bye Pass line on S.E. Railway.
- Construction of Road bridges (18 x 10.74 mtrs.) at Ghaghra for BPDP with World Bank Aid.
- Bridge No. 144, with pile foundation (4 x 18.30 mtrs.) span in connection with doubling of track on Raghunathpur-Rahama section of Cuttack-Paradeep line.
- Bridge No. 157, with pile foundation ( 1 x 8.476 + 3 x 7.556 + 1 x 8.476 mtrs.) in connection with doubling of track on Raghunathpur-Rahama section of Cuttack-Paradeep line.
- Construction of girder bridge (6 x 60’) girder over Oranga Nullah on Muri-Ranchi doubling on S.E. Railway.
- Construction of Bridge No. 83 ( 3 x 60’) across River Gowai on Kotshila-Pundag doubling on S.E. Railway.
- Construction of Bridge on River Maltijhor (13 x 12.20 mtrs.) on Sambalpur-Talcher Rail Link Project on S.E. Railway.
- Construction of Bridge No. 8 (2 x 12.2 + 1 x 18.3 mtrs. girder) in Chandil-Suisa Railway Diversion project on S.E. Railway.
- Construction of Bridge No. 436 with pile foundation at Hathbandh between Bilaspur-Raipur on S.E. Railway.
- Construction of bridge near Gokulpur for Tata Metaliks Ltd.
- Construction of Bridges Nos. 4,10,11,12 & 13 of Piparwar Project of Central Coalfields Ltd.
- Construction of Road Bridges (9 x 8.758 mtrs.) at Lapung for BPDP with World Bank Aid.
- Construction of Road Bridges (8 x 8.758 mtrs.) at Karra for BPDP with World Bank Aid.
- Construction of Road Bridges (8 x 8.740 mtrs. span + 2 x 9.931 mtrs. span) at Bharno for BPDP with World Bank Aid.
- Road Bridge (5 x 8.40 mtrs. span) in Keshav Patnam village for Warangal-Karimnagar Road (W.B. Project).
- Numerous minor bridges viz. RCC box, Flat top, Pipe culvert etc.
- Road Bridge (2 x 10.40 mtrs. span) at Village Tadikal for Warangal-Karimnagar Road Project.
- Road Bridge (6x8.696 Mtr. Span) at Huzurabad village for Warangal-Karimnagar Road.
- Road Bridge (3x7.40 Mtr. Sapn) at Km.58 for Warangal- Karimnagar Road.
- Works for casting of pre-cast R.C.C. box segments between Ranchi – Lohardaga station in connection with Gauge Conversion project.
- Construction of Pre stressed Concrete Girder Bridge no. 334 (3 x 12.2 m span) of Tomka Banspani Rail Link project.
- Construction of Pre stressed Concrete Girder Bridge no. 22 (9 x 18.30 m span) of BDR Railway with Gauge Conversion.
- Construction of Major bridge No.63 (6x12.2m PSC girders) in connection with Ranchi-Lohardaga gauge conversion from NG to BG.
- Construction of 900m Length of Bridges in Deoghar District for Package No.02 of RD Spl. Division, Govt. of Jharkhand.
- Construction of 19 Nos. ROB in Koderma-Giridih Section.
- Construction of 20 Nos. ROB In Koderma-Giridih section.
- Construction of major bridges & box bridge in connection with Koderma-Ranchi new BG line.
- Construction of Flyover & H.L. R.C.C. Bridge over river Subarnarekha on NH-33 at Namkum in the State of Jharkhand.
- Construction of major Bridge No.21 & Bridge No.38 between Dumerta and Champajharan stations of CKP Division.
- Construction of 2 Nos. ROB of BNDM-BUF station of CKP Division.
- Construction Major bridge at Km 119.255 (2x45.7M+1x30.5M Open web girder) in Hazaribag-Barkakana section.
- Bridges at Km.146.035 & Km.182.354 in Barkakana-Ranchi section.
- ROB’s between Ch.138.807 Km. to 198.666 Km. in Barkakana-Ranchi Bridge No.47 & 86 in Chakradharpur Division.
- ROB at Km.427/2-3 between Ranchi-Piska Stn. in Ranchi-Lohardaga section.